We Have New Lewis Deck Installation Videos
We keep on being asked about how to lay our Lewis Deck system and the previous installation video wasn’t ideal when it came to showing how simple this was. So, in conjunction with the manufacturer of the deck we’ve had a series of new videos produced.
The list of new videos, and links, are as follows:
Installation of Lewis Deck on Timber Joists
The Overlapping of Lewis Deck Sheets
Installation of an Acoustic Floating Floor with Lewis Deck on Timber Joists
Installation of Underfloor Heating Pipes on Lewis Deck
These videos have been with English subtitles.
Installation:
Lewis Deck Dovetailed sheeting is easy to install. These general recommendations are based on more than 75 years of experience.
Before you start – Safety:
When laying LEWIS floors, always pay attention to safety. The edges of the sheets may be sharp. Therefore, wear protective gloves and safety shoes.
Keep in mind that the sheets may be deformed if they are exposed to excessive loads.
Laying the sheets
Standard laying procedure is a first row of sheets lengthwise, the first sheet with the blue print below, the following with the print on top. The adjacent row starts with a sheet with the blue print on top, etc. The sheets can also be laid “stretcher bonding”. The LEWIS sheets must be laid at right angles across the timber joisting, even if directly laid on the floor boards.
Crosscut overlaps
≥ 50 mm overlap if completely supported and nailed onto the existing floor. ≥ 100 mm overlap if laid on the timber joists or “floating” on resilient strips.
Crosscut overlaps are made by having the sheets “click” into each other alternately (one with the blue print below and one with the print up) over a length of 50 – 100 mm. Crosscut overlaps can be adjusted by sliding the sheets together or apart a bit more.
If LEWIS mineral wool resilient strips are used, first click the sheets together on a hard (not springy) surface!
Lengthwise overlaps
Overlaps should preferably not be limited to the side flanges. In order to make the LEWIS floor less vulnerable to construction traffic, it is necessary to also include part of the profile itself in the overlap. For this purpose, slide the side flanges as far as possible over the first profile. The upright part of the first profile will butt against the upright part of the first profile of the adjacent sheet.
Edge detail
Allow for expansion at the edge of the floor using a flanking strip.
Shortening and cut-outs
To cut the LEWIS sheets to size, both widthwise and lengthwise, using a circular saw with a disc capable of cutting steel is preferable. Cut-outs can be made with the same tool, a grinder or with a jigsaw.
Attachment
The LEWIS sheets should be nailed into the upper flange where the sheets overlap on new timber joists and floor boards.
This can be done with regular wire nails or self-tapping screws. On old timber joists or floor boards, the sheets can be nailed into the lower flange. On steel beams, the LEWIS sheets should be pop riveted. Good attachment can also be achieved with Hilti rivets or dowels.
Note: When immobile connection is achieved by attachment with dowels or a nail gun, additional anti-shrinkage reinforcement is needed.
On concrete beams and masonry supports the sheets must be laid in cement mortar and temporary weighted until the mortar has set. Parker screws can be used on aerated concrete blocks.
Interconnected (wood-concrete) LEWIS floors
In order to prevent initial deflection of the timber supporting structure, it must be underpinned temporarily, e.g. by means of screw struts.
After the LEWIS sheets have been laid at right angles to the timber joists in the usual way, allowing sufficient overlap, a hardened LEWIS screw nail is driven into each lower flange. After attachment, the head of the nail should be at the same level as the top of the LEWIS sheeting.
Floating sound resistant LEWIS floors
Install LEWIS mineral wool resilient strips – nominal thickness 25mm, width 100 mm (or the full width of the beam +10 mm), at 500 mm centres.
The strips can be laid onto the floor boards (over the joists!) or directly on the joists. If the centre-to-centre distance exceeds 800 mm and/or the load applied exceeds 2.5 kN/m2, LEWIS CDM resin-bonded rubber or LEWIS CDM PF resilient strips should be used.
Note: Lengthwise overlaps of the LEWIS sheeting, that are approx. 100 mm wide, must always be made over a supporting resilient strip. LEWIS mineral wool perimeter strips 20 mm thick and 100 mm high must be used.
Contact bridges for central heating ducts, pipes, etc. must be avoided by insulating with the same mineral wool.
In case of uneven drying and setting, the LEWIS concrete floor may be pushed up in the corners and along the edges (edge curl). Therefore, the LEWIS sheets must be temporarily fixed by using Parker screws that are screwed through wedge-shaped wooden flutes, alternatively a screw and washer can be used within a small plastic plant pot for the same purpose. Make sure the level of the flutes is the same as the thickness of the fine gravel concrete. After the concrete has hardened sufficiently, remove the Parker screws and the flutes and fill in the holes with mortar. As an alternative, the LEWIS floor can be supported against the storey above by using slats.
Waterproof (bathroom) LEWIS floors
LEWIS floors with underfloor heating
Keep a 10 mm space at minimum between the perimeter of the floor and the vertical walls by using LEWIS Mineral Wool Flanking Strips, for example.
Mount the floor heating pipes to the upper flange of the LEWIS sheeting by means of Clip-Rail and/or P-Clips and self-drilling screws. Do not attach the sheets themselves to the subfloor!
Concrete composition / application general
When installing the LEWIS sheeting, bear in mind that this initially serves only to support the mortar and will only start functioning as reinforcement after the concrete mortar has set.
Therefore it is not possible to lay a ceramic or natural stone floor finishing in the mortar directly. Terrazzo (granite) floors must always be applied to a smooth, finished concrete substrate.
Type of mortar floating floor:
- < 800 mm centres fine gravel concrete/liquid screed
- > 800 mm centres liquid screed. Alternative: fine gravel concrete + anti-shrinkage reinforcement at the crosscut overlaps (ø5-150).
Composition
- By weight:
- 1 part Portland cement
- 3 parts concrete sand (0-4 mm)
- 1.2 parts fine gravel (2-8 mm)
- By volume
- 1 part Portland cement
- 2.5 parts concrete sand (0-4 mm):
- 1 part fine gravel (2-8 mm)
For 1 m3 concrete: 285 litres Portland cement, 715 litres concrete sand and 285 litres fine gravel.
Recommended thicknesses of concrete: Minimum thickness floor for housing: 16 mm + min. 20 mm = 36 mm standard floor for the majority of applications: 16 mm + 34 mm = 50 mm interconnected floor: 16 mm + 34 mm = 50 mm floor heating: 16 mm + 16* mm + 20/25 mm = 52/57 mm Note: Profile height of LEWIS sheet 16 mm + concrete cover layer = total floor thickness.
* to accommodate diameter of heating pipes.Usage
Floor thickness 16+34=50mm / average concrete thickness = LEWIS floor thickness 50 – 8 = 42 mm.
Underpinning
In case the intervals between the centres of joists are greater than 1200 mm or when the amount of concrete poured onto the sheets exceeds 50 mm, it may be necessary to temporarily underpin the LEWIS sheets.
Note: Have the supporting structure (joists, walls, foundation) professionally checked to ensure that it is strong enough to support the new LEWIS floor!
Application/drying
Use scaffolding boards placed at right angles to the supporting joists when pouring concrete. Screed the concrete mortar in lengths running at right angles to the grooves in the sheets.
Allow the fine gravel concrete mortar applied to the LEWIS sheeting to dry / harden gradually. Although it is always possible that a limited amount of cracking will occur in this type of thin concrete flooring, cracks due to shrinkage and the so-called burning of the concrete mortar can be prevented to a considerable extent. Cover the finished mortar floor with polyethylene foil and do not apply any stress to the floor until it has hardened sufficiently!
General
Fine gravel concrete, tiles, flagstones, natural stone or terazzo must be applied according to the current standards and regulations. Tile adhesive may be used.
Case Studies
Self Build & Renovations
FAQs22
Ask CDI a Question
-
Q
What are the Lewis Deck sheet sizes?
AQ: What sheet sizes are held in stock for delivery within a few days after order? A: We stock 2500mm and 1300mm sheets. These are all 630mm wide and 16mm deep. Deliveries are made via the pallet network directly to site. The smaller sheets are aimed at small bathroom renovation projects and can be supplied in small numbers via TNT. 2.5* and 1.3m sheets allow for the 100mm overlap to occur over a joist, with joist centres being either 300mm, 400mm, 600mm, 800mm*, 1200mm and 2400mm*. (*2.5m sheet only) For larger projects we are able to produce bespoke sheet sizes if required, please get in contact to discuss other options for sheet sizes.
-
Q
Why don't my Lewis sheets interlock like they do in the video?
AQ: Why don't my sheets interlock like they do in the video? A: The sheets have two sides (one printed, one plain), the dovetails on either side are different widths, it is then necessary to alternate the sheets print up and then print down.
QIs this a question?
AIf it is, this is an answer.
Latest Blog
CDI 2024
Is Underfloor Heating Compatible With Carpet?
11th October 2024
At Every Exhibition We Get Asked Can You Have Underfloor Heating With Carpet? Hopefully here we explain why the answer to that is YES. With carpet providing a soft, luxurious feel to your home many people ask whether underfloor heating and carpet can go…
View AllCow Close Barn with Heat Pump and Underfloor Heating
26th May 2023
Paul M contacted us in early 2022 to discuss the use of the Lewis Deck system following a recommendation by his Ground Source Heat Pump system installer. We worked through the drawings and provided a quote, the Lewis Deck and…
View All2022 Has Begun and Exhibitions Are, Fingers Crossed, Back To Normal.
21st January 2022
Starting on Friday 28th January, now that COVID has magically disappeared, we are heading back on the road and will be exhibiting for a full year for the first time since 2019. Next Friday sees the first exhibition at the…
View AllChat Live
Hi you're speaking to Dave, how can I help.Website by Indigo